The roads made with asphalt should have the strongest and most durable foundation that it can have. This lessens the risk of it cracking and being damaged due to weight and weathering, also helps it with the lifespan. The financial risk for this is really huge so you better invest in only the best quality and make sure you got the right contractor.

The base must be the strongest and most compact structure in the whole installation. So, before placing and pouring the asphalt paving Los Angeles, you need to make sure that the sub base is as hard as a rock to prevent it from shifting or moving. This causes those cracks that are usually seen on cheaply done pavements.

For the first step, any unwanted materials should be dug out and removed from the job site. Dig to about a foot deep while removing loam, soft soil, and also stumps. It is not advisable to pave over an existing concrete or old pavement, since there is total uncertainty on the quality of the ground underneath.

The next step would be base and grading where the proper installation of materials beneath the asphalt should be placed. This determines the overall foundation of the pavement and also with its durability. Place about four inches to six inches of crushed concrete or asphalt millings.

These concrete and asphalt millings are actually engineered to be used this way as foundation for road construction. With a skidrow, even out the base and have this spread all over properly. And then with a transit or a laser level, make sure that the water flow is controlled over the surface. The vibratory roller would be the one to compress the base until the thickness is matched with the desired measurements.

There are two layers of mixtures to be placed on the pavement. These mixtures should be from the plant nearest just to make sure that it is fresh and still hot when applied all over the surface. Depending on the contractor, usually there are two layers for parking lots and only one for driveways.

The layering is called a lift. The first lift consists of huge rocks to form the base course of the layer. This creates a harder layer in order to support more. The second layer or lift would consists of smaller and finer stones in order for it to create a smooth finish.

Compression should be done again in order to make this compact and solidified. A vibratory drum roller is used to even out the surface and compact it as well. Also, the edges should be sloped to about forty five degrees which is already enough to support weight and movement from vehicles.

The connection between this and other pavements should always be a diamond cut in order for both these surfaces to meet flush underground. The best way to make sure of this is through skim coating the layers thinly over the edges and nearby other surfaces. This allows snowplows to lift it up and it is too thin to support weight.